Ecological Studies
Regional Cross-boundary Overhead Transmission Line
- Location
- KSA & Region
The client is developing a regional cross-boundary OHTL for power evacuation and exchange within the region. The original ecological survey performed for national permitting procedures was flagged as insufficient by the Lender’s Environmental Advisor and BioConserve was commissioned to re-survey the site for validation and added depth of information. Recommendations were provided which considered the proposed construction and operation measures and monitoring to ensure alignment with IFC P.S.6.